News and information on Shell PLC
Extract from an article by Mikael Holter published 2 April 2014 by Bloomberg NewsPosted in: Bloomberg, Oil, Royal Dutch Shell Plc, Shell Project Delays, Shell Project Overruns.
Tagged: Oil · Royal Dutch Shell Plc

This is not a Shell website. That fact should be abundantly plain from the overall content of this home page and our sister Shell-focussed websites, including shellnazihistory.com. Click on the Disclaimer link at top of this page for more information. You Can Be Sure Shell does not endorse or approve of this website. There are no subscription charges nor do we solicit or accept donations. It is an entirely free to use website drawing attention to the negative side of Shell while also publishing positive news about the company. The Shell logo image with the white text used on this website, as per the above example, is in the public domain because its copyright has expired and its author is anonymous. It can be found on WIKIMEDIA COMMONS. Our shellenergy.website publishes Shell Energy customer complaints posted on Trustpilot where there is an ample supply. Use this link for Shell’s own website.



EBOOK TITLE: “SIR HENRI DETERDING AND THE NAZI HISTORY OF ROYAL DUTCH SHELL” – AVAILABLE ON AMAZON

EBOOK TITLE: “JOHN DONOVAN, SHELL’S NIGHTMARE: MY EPIC FEUD WITH THE UNSCRUPULOUS OIL GIANT ROYAL DUTCH SHELL” – AVAILABLE ON AMAZON.

EBOOK TITLE: “TOXIC FACTS ABOUT SHELL REMOVED FROM WIKIPEDIA – HOW SHELL BECAME THE MOST HATED BRAND IN THE WORLD” – AVAILABLE ON AMAZON.
Royal Dutch Shell conspired directly with Hitler, financed the Nazi Party, was anti-Semitic and sold out its own Dutch Jewish employees to the Nazis. Shell had a close relationship with the Nazis during and after the reign of Sir Henri Deterding, an ardent Nazi, and the founder and decades long leader of the Royal Dutch Shell Group. His burial ceremony, which had all the trappings of a state funeral, was held at his private estate in Mecklenburg, Germany. The spectacle (photographs below) included a funeral procession led by a horse drawn funeral hearse with senior Nazis officials and senior Royal Dutch Shell directors in attendance, Nazi salutes at the graveside, swastika banners on display and wreaths and personal tributes from Adolf Hitler and Reichsmarschall, Hermann Goring. Deterding was an honored associate and supporter of Hitler and a personal friend of Goring.
Deterding was the guest of Hitler during a four day summit meeting at Berchtesgaden. Sir Henri and Hitler both had ambitions on Russian oil fields. Only an honored personal guest would be rewarded with a private four day meeting at Hitler’s mountain top retreat.











IN JULY 2007, MR BILL CAMPBELL (ABOVE, A RETIRED GROUP AUDITOR OF SHELL INTERNATIONAL SENT AN EMAIL TO EVERY UK MP AND MEMBER OF THE HOUSE OF LORDS:


MORE DETAILS:

MORE DETAILS: After a solicitor acting for Shell threatened to make the litigation "drawn out and difficult" with the intention of draining the resources of a financially weaker opponent, my late father (Alfred Donovan) and I decided to mount a wide-ranging campaign as a counter-measure. We jointly founded the Shell Corporate Conscience Pressure Group, which nearly 15% of Shell UK retailers joined. We regularly conducted ethical surveys involving up to 1500 Shell petrol stations. All responses were opened and authenticated by an independent solicitor who supplied Affidavits confirming the results. In whole page announcements in trade magazines (examples above) we challenged Shell to commission and publish the resuits of independent research asking the same questions and offering respondents GUARANTEED anonymity. Shell never took up the invitation. Instead it asked the UK Advertising Standards Authority to investigate our Shell surveys. No problems were found. The head-cut image of Alfred Donovan appears courtesy of The Wall Street Journal. 










See our link list of over 500 articles by the FT, Wall Street Journal, Reuters, Bloomberg, Forbes, Dow Jones Newswires, New York Times, CNBC etc, plus UK House of Commons Select Committee Hansard records, information on U.S. Securities & Exchange Commission website etc. all containing references to our Shell focussed websites, or our website founders Alfred and John Donovan. Includes TV documentary features in English and German, newspaper and magazine articles, radio interviews, newsletters etc. Plus academic papers, Stratfor intelligence reports and UK, U.S. and Australian state/parliamentary publications, also citing our Shell websites. Click on this link to see the entire list, all in date order with a link to an index of over 100 books also containing references to our websites and/or our activities.

John Donovan, the website owner
A head-cut image of Alfred Donovan (now deceased) appears courtesy of The Wall Street Journal.

MARKETWATCH.COM ARTICLE: Shell’s Voser regrets U.S. shale bet, Arctic fail: 13 March 2013
FINANCIAL TIMES ARTICLE: Shell takes impairment on North America as profit slides: 1 October 2013
FINANCIAL TIMES ARTICLE: Peter Voser says he regrets Shell’s huge bet on US shale: 6 October 2013
ZEROHEDGE.COM: About That Shale Oil & Gas Miracle: 7 October 2013
POWERSOURCE/POST-GAZETTE ARTICLE: Shell to restructure shale assets in U.S.: 13 March 2014
Shell cuts spending and jobs at US shale gas arm: 13 March 2014
OILPRICE.COM ARTICLE: Shell's American Woes Highlight Difficulty of Cracking Shale: 13 March 2014
JEREMYLEGGETT.NET ARTICLE: Shale fracking is a ‘ponzi scheme’, ‘….equivalent of the dot.com crash’: 19 September 2014
SEEKINGALPHA.COM ARTICLE: Chevron A Safer Bet Than Shell: 13 April 2015



























© 2026 Royal Dutch Shell Group .com | Powered by WordPress
A WordPress theme by Ravi Varma